New Projects in DHA Lahore

What DHA is building, what it has only signed, and what already stands.

Last updated:

Every project DHA Lahore has built, is building, has signed, or is still looking for a partner for — the malls, towers, hospitals, schools and restaurants inside the phases, plus the new phase itself. What each one is, where it stands today, and what it does to the plots around it.

The new phase1

A whole new phase of DHA Lahore — announced, files sold, but not yet balloted and not yet built.

Built and running24

Projects you can walk into today. These are the ones that already changed the rates around them — and where DHA's own list is out of date, we say so.

Open and runningGoldcrest Mall & ResidencyShopping mall + apartments · Plot 456, Block DD, Phase 4DHA Phase 4's working mall — 55 brands, Al-Fatah, a padel court on the terrace, and 254 apartments above. A Giga Group joint venture with DHA.Open and runningHaly TowerCommercial tower — offices and mall · Lalak Jan Chowk, Sector R, Phase 2DHA Lahore's first high-rise commercial plaza — inaugurated in 2017, and today an address that software houses and multinationals print on their own websites.Open and runningIMC Hospital (Integrated Medical Care)Hospital · Sector F, Phase 5 — behind LUMSA 125-bed multi-speciality hospital running inside Phase 5 since October 2021 — not the 25-bed day-care centre DHA's old page described.Open and runningPenta SquareApartments and a mall · CCA, Sector C, Phase 5DHA's own first big apartment project — six blocks in the Phase 5 CCA, keys handed over in June 2022, and apartments that have roughly doubled per square foot since launch.Open and runningDHA Business HubCorporate office tower · Block D, Commercial Broadway, Phase 8DHA's own corporate tower on Phase 8's Broadway — 26 kanal, occupied by multinationals and software houses, and leased rather than sold.Open and runningOPTP restaurant, Phase 5Restaurant · Plot 254/4, Sector G, Phase 5The chain's own 72nd outlet and, in its own words, its grandest — open since March 2025 on DHA's land. DHA's share of it is over five times the build cost.Open and runningPind restaurant, Phase 5Restaurant · Plot 254/2, Sector G, Phase 5Five floors, two rooftop decks and a tall antique wooden door — a village-themed restaurant opened in Sector G at the end of January 2026 and inaugurated by a federal minister.Open and runningLearning Alliance International campus, Phase 8IB World School campus · Central Commercial Area, Phase 8Already open. Students moved into the new purpose-built campus for the August 2026 session, while DHA's own page was still looking forward to inaugurating it.Open and runningDolmen Mall LahoreShopping mall · Sector A, Phase 6The biggest thing DHA Lahore has opened in years — a 46,000 square metre mall in Sector A, trading since December 2024, right beside DHA's own head office.Open and runningCarrefour in DHA LahoreHypermarket · Plot 111, Sector T, Phase 7 — and Phase 11 RahbarThe joint venture that shows what a DHA deal looks like when it works — signed April 2022 for two stores, a billion rupees, and trading within about eighteen months.Open and runningThe Defence Club, J Sector, Phase 1Members' club · Street 78, Sector J, Phase 1DHA Lahore's oldest and largest club — 74 kanal, open since 1992, and the only one with a mini golf course and grass tennis courts.Open and runningThe Defence Club, R Sector, Phase 2Members' club · Sector R, Phase 2 — near Lalik Jan ChowkNineteen kanal beside Lalik Jan Chowk — open since 1995, reorganised in 2008, and the club with a hall named after a golf view.Open and runningThe Defence Club, FF Sector, Phase 4Members' club · Sector FF, Phase 4DHA's smallest club at 13.75 kanal — and the only one whose membership fees DHA has actually put in writing.Open and runningDefence Lemniscate Club, Phase 8Members' club · Phase 8 Ex Park View, Sector EThe newest DHA club open today — inaugurated 7 November 2021 on 24 kanal, with a yoga centre, a football ground and an indoor pool.Open and runningDefence Raya Golf & Country ClubGolf course and country club · DHA Phase 6 — Fairways CommercialDHA Lahore's only golf course — 18 holes, par 72, open since 2010, built with a Malaysian partner on a roughly 400-acre township.Open and runningXX Sports Complex, Phase 3Sports complex · Street 7, Block XX, DHA Phase 3A cricket stadium, a skating rink, karate, eleven sports and a national cricket academy — with DHA's own December 2025 rates, all of them.Open and runningCapt Fasih Babar Amin Shaheed Sports ComplexSports complex · 135 Street 2, Sector A, DHA Phase 6Named for an Armoured Corps officer who fell in South Waziristan in 2012 — open since November 2020, with a cricket stadium, CrossFit, futsal and a 630-metre track.Open and runningK Swimming Pool Complex, Phase 5Swimming pool complex · Sector K, DHA Phase 5An Olympic-size pool, covered and heated — reported as the third Olympic pool in Pakistan and the first covered and heated one. Open all year.Open and runningY Block Swimming Pool & Gym Complex, Phase 3Swimming pool and gym · Sector Y, DHA Phase 3DHA's other swimming pool — in Phase 3, with its own published rates and the cheapest senior-citizen swimming DHA offers.Open and runningDHA Cinema, Phase 2Cinema · 305-R, R Block, Phase 2 — Lalik Jan ChowkAn auditorium DHA turned into a cinema in 2007, opened with Khuda Kay Liye, shut in a dispute in 2011 — and showing films again today.Open and runningOval Complex, Phase 9 PrismCommercial area, and DHA land · Sector OC, Phase 9 PrismA commercial ring of 4-marla plots that already trades on the open market — with 97 kanal at its centre that DHA is still offering to a partner.Open and runningWhere to hold a function in DHA LahoreHalls and event venues · Phases 1, 2, 4, 5 and 8Every hall DHA Lahore runs, with its real capacity — and the plain fact that only the Phase 5 halls are big enough for a wedding.Open and runningHospitals and medical care in DHA LahoreHospitals and medical facilities · Phases 1, 3, 5 and 6DHA runs one hospital, of 46 beds. It has reserved around 280 kanal for six more — and not one of them has been built.Open and runningDHA Lahore's own clubs, sports and poolsIndex of DHA's own facilities · Phases 1, 2, 3, 4, 5, 6 and 8Five clubs, two sports complexes, two pools and a golf course — with land, year and rates where DHA publishes them. Each has its own page.

Under construction7

Signed, designed and being built — or at least being sold. Where we could find no photograph of anything actually standing, the page says that too.

Under constructionSuriya Devs — sold as DHA CondominiumsFive residential towers · Plot 706, Sector GG, Phase 4Five towers on 47 kanal in Phase 4, sold as DHA Condominiums at Rs 32,500 a square foot, with completion set for 2029.Under constructionPearl Axis Tower — sold as Axis TowersFour residential towers · Plot 161, Sector A, Phase 6 — opposite Dolmen MallThe largest project by value on DHA's recent joint-venture record — 49.8 kanal two hundred metres from Dolmen Mall, confirmed against DHA's own map data.Under constructionRenovation Master — sold as The VUEMixed-use high-rise · Plot 01 MB, Sector B, Phase 6Seventeen floors on a 37-marla plot at the very head of Phase 6's Main Boulevard — three commercial floors, three corporate, nine residential and two penthouse levels.Under constructionNew Life ResidenciaThree residential blocks · Plot 273/1, Sector Q, Phase 2The only apartment project DHA lists in Phase 2 — three blocks on 23.83 kanal, selling at Rs 24,000 a square foot, with no possession date ever published.Under constructionICON Mall & TowersMall and towers · MB-46, Main Boulevard, Phase 6The second big tower going up on Phase 6's Main Boulevard — the first tower reported sold out, the second in pre-launch.Under constructionHyatt Regency Lahore DHAFive-star hotel · DHA Phase 6An international hotel brand coming to Phase 6 — announced in January 2023 for a 2024 opening, and still under construction well into 2026.Under constructionDefence Revelation Club, Phase 6Members' club — under construction · DHA Phase 6171 kanal and 94 guest rooms — the club DHA is building in Phase 6 is larger than all four of its existing clubs put together.

Signed on paper15

Agreements, MOUs and committee approvals. Paper is done; the building is not — and for some of these we could not find the company at all. Each page says exactly what we could and could not confirm.

Signed and approvedWasabi restaurant, Phase 5Restaurant · Sector G, Phase 5The biggest restaurant agreement on DHA's record by value — and no sign of the outlet yet. But the same group has a much bigger DHA project in Phase 6.Signed and approvedPizza Hut, Phase 5Restaurant · Sector G, Phase 5Approved for Sector G — but Pizza Hut's own store database has twenty branches in Pakistan and not one of them is in Phase 5.Signed and approvedOPTP restaurant, Phase 11 RahbarRestaurant · Sector 1B, Phase 11 (Rahbar)Not open yet — but DHA's own booklet carries a drawing of the building under the heading "what is becoming reality". This one has a picture, just not a photograph.Signed and approvedThe Educators school, Phase 8Educational institute · Phase 8We checked The Educators' own campus database — sixty campuses in Lahore, and not one in Phase 8. The name on this record may not be the right one.Signed and approvedBahria Town apartments, Phase 6Residential apartments · Phase 6We could not confirm this anywhere — not on DHA's site, not on Bahria Town's, not in any news. And Bahria Town itself says its own work is suspended.Signed and approvedFood Arena, Phase 6Food and dining complex · Phase 6The name is real — DHA ran a design competition called Food Arena in 2020, and it was never built. The 20-kanal project on the record traces to a single page.Signed and approvedPak Gulf commercial plaza, Phase 6Commercial plaza · Phase 6Six and a half kanal in one hand would be a large commercial holding in Phase 6 — but this entry rests on a single uncited line and is absent from both parties' own websites.Signed and approvedTotalish mixed-use building, MBMixed-use building · Plot 125-C, MB commercialThe project that appears twice on DHA's record — and the reason why turns out to be the most useful thing on this hub.Signed and approvedHBG Creations project, Phase 7Development project (MOU) · Phase 7Nearly eight kanal at Rs 6,300 million — a figure that makes sense as a building, but a company we could not find anywhere.Signed and approvedZee Concepts apartments, Phase 7Residential apartments (MOU) · Phase 7 — sources disagreeThe largest MOU on the record — for apartments in a phase that has never had a single apartment building.Signed and approvedEducational institute, Sector Y Phase 7Educational facility (MOU) · Sector Y, Phase 7"Edn" is not a company. It is DHA's own abbreviation for education — and DHA's own page lists this exact plot as simply "school", with no partner named.Signed and approvedGreen Vision mixed-use projectMixed-use project (MOU) · Location not stated on the recordRs 6,180 million, no phase, no sector, and a company we could not find in Pakistan at all.Signed and approvedZameen Development mixed-use projectMixed-use development · Sector A — phase disputed between sourcesBy value the largest project on DHA's 2023–25 joint-venture record — around Rs 16 billion on 42.95 kanal, with DHA's own share put at over Rs 10 billion.Signed and approvedThe CreekRestaurants, theme park and leisure · DHA Phase 6Wasabi & Co's own website describes a five-acre venture with DHA Lahore in Phase 6 — several restaurants, a theme park and leisure. This is the DHA–Wasabi deal that is actually documented.Signed and approvedOne Central, DHA LahoreMixed-use scheme — unverified · Abdullah Gul Interchange, Ring Road — as dealers describe itPlots here sell at sixteen to seventeen crore. DHA's own website has never mentioned the name. Read this page before you pay anybody.

Land DHA is still offering2

Not projects yet — these are the plots DHA itself is advertising to partners right now. A theme park, a golf course, a shopping mall, an entertainment complex. Whoever signs, this is what gets built next.

The whole joint-venture record

What a joint venture means here

DHA owns a great deal of commercial land inside its own phases. Instead of building on it itself, it signs a joint venture: DHA puts in the land, a private company puts in the money and the construction, and the two share what comes out. This is how most of DHA Lahore's larger commercial buildings now get built.

Between October 2023 and June 2025 the Joint Venture Directorate closed ten such agreements, signed five MOUs, and put a further set of projects through its approval committee. Everything below is that record. Every project name in these tables opens its own page.

Agreements signed

CompanyWhatWhereValue
The Potato Factory International (OPTP)RestaurantSector G, Phase V — 0.95 kanalRs 103 million
Quisitive (Pvt) Ltd — WasabiRestaurantSector G, Phase V
Learning Alliance (Pvt) LtdEducational instituteCCA-2, Phase VIIIRs 1,146 million
Surya Dev (Pvt) LtdResidential apartmentsSector GGRs 2,960 million
The Pearl GPResidential apartmentsSector A, Phase VIRs 10,966 million
Renovation Masters (Pvt) LtdMixed-use buildingMB, Phase VIRs 1,980 million
Totalish (Pvt) LtdMixed-use building125-C, Phase MB
Pind RestaurantRestaurantSector G, Phase V
The Potato Factory International (OPTP)RestaurantSector 1B, Phase XI

MOUs signed

An MOU is a statement of intent. It records that both sides want to do something together; it is not yet the agreement that lets a building start.

CompanyWhatWhereValue
HBG Creations (Pvt) LtdDevelopment project — 7.95 kanalPhase VIIRs 6,300 million
Zee Concepts (Pvt) LtdResidential apartmentsPhase VIIRs 7,924 million
Green Vision Construction (Pvt) LtdMixed-use projectRs 6,180 million
Edn InstituteEducational facility — 23.7 kanalPhase VIIRs 4,968 million
The Potato Factory International (OPTP)RestaurantPhase XI

Approved by the JV committee

ProjectByWhereValue
Food Arena — 20 kanalRoyal Orchard GroupPhase VIRs 1,400 million (DHA share Rs 1,100 million)
Commercial plaza — 6.5 kanalPak Gulf ConstructionPhase VIRs 1,800 million
Mixed-use buildingTotalish (Pvt) Ltd125-C, Phase MB
Educational instituteThe EducatorsPhase VIII
RestaurantPizza HutSector G, Phase V
ApartmentsBahria TownPhase VI

What this means for plot owners

Read the list by sector, not by company name. Sector G in Phase V is collecting restaurants. Phase VI is collecting apartment blocks, a food arena and a commercial plaza. Phase VII has two large residential schemes and a school on paper. CCA-2 in Phase VIII has an education project signed.

That is the useful signal. When restaurants cluster on one commercial stretch, the stretch becomes an eating-out address and its rents follow. When apartments and a school are signed in a sector, the residential plots around them get the traffic and the buyers that come with density.

Do not pay a premium today for a building that exists only on paper. An agreement is a plan, an MOU is barely that, and both can lapse. Pay for what is built; treat what is signed as a reason to watch the sector, not a reason to overpay.

How to read this page

  • We checked every project on this page ourselves — DHA's own records, the developers' own sites, Google, the food-delivery apps, the property portals. Where a fact is confirmed, it is stated plainly. Where it is not, the page says so instead of guessing.
  • DHA's own project pages carry mistakes — a fake American address on one, Latin filler text on another, a partner's name printed where the project name belongs, empty height fields, and a hospital still described as 35% built four years after it opened. Where DHA's page and the ground disagree, we print what is actually there.
  • Many projects are sold under a completely different name from the one in DHA's record. Renovation Master is sold as The VUE, Suriya Devs as DHA Condominiums, Pearl Axis Tower as Axis Towers. Both names are on every page, because you will hear one and search for the other.
  • We do not print file rates or plot prices on these pages. They move every week and a written rate goes stale the day after. Where a developer has published an official price list, we date it. Live rates are on the rate pages.
  • An announcement is not a building, an MOU is not an agreement, and an agreement is not a building either. DHA's own process has fifteen steps and the MOU is step nine — six steps of audit, engineering and legal vetting still stand between it and a signature.